USED AT:
CONTEXT:
NODE: TITLE: NUMBER:
AUTHOR: Dennis Buede
PROJECT: Engineering Design of a Syste
NOTES: 1 2 3 4 5 6 7 8 9 10
DATE:
REV:
WORKING
DRAFT
RECOMMENDED
PUBLICATION
READER
P. 14
Design
Changes
Conduct
Early
Validation
A21
Conduct
Integration &
Verification
A22
Conduct
Validation
A23
"Built-to"
Configuration
Items & Pre-
Production
Prototypes
System
Integration
Phase
Documentation
System Design
Phase
Documentation
Qualification Procedures,
Activities, & Models
Conduct
Acceptance
Testing
A24
"Built-to"
CIs
Pre-Production
Prototypes
Acceptance
Testing
Document
Validation
Document
Verification
Document
Early
Validation
Document
Early
Validation
Changes
Verification
Changes
Validation
Changes
Acceptance
Changes
Operational
Concept
Acceptance
Criteria &
Thresholds
Verification
Data
Validation
Data
Operational
System
Acceptance
or Rejection
Inputs of Stakeholders
x
GMU Systems
Engineering
Program
05/24/99
Perform Qualification & Integration Activities
A2
Operational Concept,
Stakeholders’ Requirements,
Derived Requirements
Derived &
Stakeholders’
Requirements
DATE
APPENDIX B 469