Топливно-энергетический комплекс
  • формат pdf
  • размер 737.31 КБ
  • добавлен 18 октября 2011 г.
Aguro K., Kato M., Kishita F. Rich operation experiences and new technologies on adjustable speed pumped storage systems in Japan
Sigre 2008

K. Aguro, The Kansai Electric, Power Co. Inc.
M. Kato, Kyushu Electric, Power Co. Inc.
F. Kishita, Electric Power, Development Co., Ltd.

An adjustable speed pumped storage system can control pump input power by varying pump rotating speed, and contributes to power system Automatic Frequency Control (AFC) operation with pumping operation, which can not be realized by conventional single speed unit, during light load hours such as night, holidays and so on. In Japan, 8 adjustable speed units, which are the largest number in the world, are operated at present, and furthermore 6units are under construction or planned. According to one year operation records of power utility companies the adjustable speed pumped storage systems are mainly used for pumping and are operated much longer time than single speed units (more than 7 times), while single speed units installed in the same power plant are mainly used for generating. This means the adjustable speed units are utilized to stabilize power system frequency. Utility companies consider advantages of the adjustable speed system as AFC operation and goveor free operation in pumping mode, instantaneous active and reactive power control, reducing impact on power system at pump starting by gradually increasing its input power, and expanding turbine load range by speed optimization. Regarding the maintenance of the system, utility companies point out some additional maintenance items of AC-excitation system, generator-motor carbon brushes and its dust filters.
Смотрите также

Arrillaga Jos Power Systems Electromagnetics Trasients Simulations

  • формат pdf
  • размер 3.43 МБ
  • добавлен 27 февраля 2010 г.
Bodmin, the Institution of Engineering and Technology, UK, 2007, 449 стр. содержит 13 частей и 8 приложеней. Разсмотрены основы вычисления електромагнитных переходных процессов и данны примеры.

Dovganjuk I.Y. and other - at site and service exrerience verification of the pincipally new turbogenerator type-asynchronized air cooled one

  • формат pdf
  • размер 525.11 КБ
  • добавлен 18 октября 2011 г.
I.Y. Dovganjuk I.A. Labunets L. G. Mamikonyants Vniie V.E. Zinakov E.V. Chernishov MosEnergo L.A. Kadi-Ogli N.D. Pinchuk Electrosila Plant The air cooled 110 MW synchronized (two axis excited) two pole turbogenerator T3FA-110 type has been described briefly in the CIGRE Session 2004 paper A1- 103. The prototype of this machine has been put in operation in the one of Moscow thermal power plants in 2003 December. Additionally to the standard tes...