280
Metallurgical Process Engineering
sion functions, particularly function
of
energy conversion. For instance, the issues
about TRT power generation with BF top pressure, generating power by BF gas-
stream boiler-steam turbine, by BF gas-gas turbine, and by waste heat boiler-
steam turbine must all be considered. These are worthy to investigate under con-
ditions both
of
large integrated steel plants and many smaller BF steel plants in
China.
3. Continuous operation and process continuation
ofBF
ironmaking.
In the discussion
of
the basic characteristics
of
BF operation, it was mentioned
that the BF process has the natures
of
continuous production process (countercur-
rent, continuous moving reaction bed operation) and the batch iron tapping (or
batch iron ladle transporting). Therefore, the essence and core
of
BF natures are
its continuity. This is very much noteworthy.
If
the time- space scale enlarged,
people would have a new and in-depth cognition
of
operation continuity and
process continuation for BF ironmaking.
From the perspective
of
time scale
of
BF process, the continuity
of
BF smelting
is first reflected in smooth running
ofBF
and corresponding delay ratio (particularly
the unscheduled delay ratio) or calendar operation rate, the annual BF calendar op-
eration time should reach
255
~360
days by the aid
ofa
series
of
technical and man-
aging measures. So, the BF delay ratio should not be higher than
1.3%
~
1.5%,which
would deal with a series
of
related measures for smooth running, particularly the
equipment reliability and BF operation expert system. While the time scale
of
BF
operation further broadens, it would surely deal with the BF campaign of a genera-
tion. In the 21st century, the target
of
the generation campaign
of
a new large BF
should be set at
20
~25
years, the small or medium BF should be
12
~
15 years. So,
technical measures, like usage
of
soft water, water treatment technique, copper cool-
ing stave, top charging system, wall gunning technologies, refractory for furnace
hearth and bottom, must be strengthened accordingly.
If
the space scale
of
BF process continuation enlarged, it would be cer-
tainly thought
of
the related continuation
of
BF-BOF
-CC
-Hot
rolling,
particularly the long route
of
BF
-hot
metal pretreatrnent
-r-BOf
-r-secondary
metallurgy - continuous casting. This would lead to a topic about
BF's
influ-
ence on optimizing interface techiques between ironmaking and steelmaking
as well as steelmaking and continuous casting. The trend
of
further restruc-
turing
of
steel manufacturing process should be taking full advantages
of
the
continuity
of
BF operation to elevate the continuation degree
of
chemical
metallurgical processes and even to solidification. Thus, the"one after an-
other" matches
ofBF
-BOF production capacities, the matching and optimiza-
tion
of
BF iron ladle and the BOF hot metal charging ladle, including the
capacity matching
of
BF iron ladle, BOF hot metal charging ladle and BOF
(for a BOF with more than 150 t, BF iron ladle and the BOF hot metal
amount charging ladle should preferably have the same capac ity as the hot