280 Wind Energy: Renewable Energy and the Environment
My opinion: Would like 4 to 5 years of data on 50 to 60 m towers (wind speed and wind
direction at 10, 30, and 50 or 60 m).
17. Fifty-meter pole tower with gin pole, $12,500; labor, $1,000; travel expenses, $1,000.
Estimated total is $14,500.
18. Fifty meter trust tower, guyed (Rohn 45G), $3,000; labor, $4,000 (have to assemble tower
sections); travel expenses, $2,000 (need truck or assemble on site, which means more
labor at the site). Use crane to raise tower, $3,000. Estimated total is $12,000.
19. One-hundred-meter trust tower, guyed (Rohn 55G), $7,000; labor, $10,000, travel
expenses, $5,000; crane, $5,000, power (generator and gas), $3,000. Estimated total is
$30,000.
CHAPTER 5
1. See Figure 1.7. Solidity is a ratio of area of blades to area of rotor.
Notice that the solidity of the Savonius is 1 or greater. Assume 1.
The giromill has a low solidity, around 0.2. Therefore, the difference in blade material is
around 5/1.
Another way, use rotor swept area, 1010 100 m
2
. Blade area of Savonius is 100 m
2
or
greater. Giromill has three blades; assume blades are 10 m long, 0.5 m wide. Blade area
3100.5 15 m
2
. Therefore, the ratio of Savonius to giromill is 100/15.
2. Assume capacity factor 0.3. AKWH 0.3300 kW8,760 h/year 788,000 kWh/year.
3. Assume capacity factor 0.35. AMWH 0.351.5 MW8,760 h/year 4,600 MWh/year.
4. HAWT, r 50 m. Area . r
2
3.142,500 7,850 m
2
.
Choose locations: (a) one near Amarillo, Texas, P/A 400 W/m
2
; (b) one near Comodoro
Rivadavia, Argentina, P/A 800 W/m
2
.
Use Equation 5.3; assume a capacity factor of 0.35 for Amarillo and a capacity factor of
0.40 for Comodoro Rivadavia.
a. AKWH CFArWM8.76 0.3578504008.76 9,627,000 kWh/year
b. AKWH CFArWM8.76 0.478508008.76 22,000,000 kWh/year
5. Darrieus turbine, 34 r 42.5 m. Area 0.6 HD .63442.5 867 m
2
.
Use capacity factor of 0.3 and wind map values for Denmark, 500 W/m
2
, and mid-Germany,
300 W/m
2
.
AKWH CFArWM8.76 0.38675008.76 1,139,000 kWh/year
AKWH CFArWM8.76 0.38673008.76 684,000 kWh/year
6. Giromill 10 r 12 m. Area HD 1012 120 m
2
.
Use capacity factor of 0.25 and wind map values of 250 and 300 W/m
2
. Small giromill
will not be on very tall tower.
7. Estimate is around 3.3 GWh/year.
8. Use Figure 5.13, wind speed 20 m/s.
Use Equation 5.1, P Tq.
a. At constant rpm (line A in gure), 160 rpm, torque estimated at 15,000 Nm.
q 2.rpm/60 23.14160/60 17 rad/s
P Tq 12,000 Nm17 rad/s 204,000 Nm/s 204,000 W 204 kW
b. At maximum power coefcient (line B in gure).
© 2009 by Taylor & Francis Group, LLC